In this paper, the 4E assessment (Energetic, Exergetic, Exergoeconomic and Exergoenvironmental) of a low-temperature ORC activated by two different alternatives is presented. The first alternative (S1) contemplates the activation of the ORC through the recovery of waste heat from a flash-binary geothermal power plant. The second alternative (S2) contemplates the activation of the ORC using direct heat from a geothermal well. For both alternatives, the energetic and exergetic models were established. At the same time, the economic and environmental impact models were developed. Finally, based on the combination of the exergy concepts and the economic and ecological indicators, the exergoeconomic and exergoenvironmental performances of the ORC were obtained. The results show higher economic, exergoeconomic and exergoenvironmental profitability for S1. Besides, for the alternative S1, the ORC cycle has an acceptable economic profitability for a net power of 358.4 kW at a temperature of 110 °C, while for S2, this profitability starts being attractive for a power 2.65 times greater than S1 and with a temperature higher than 135 °C. In conclusion, the above represents an area of opportunity and a considerable advantage for the implementation of the ORC in the recovery of waste heat from flash-binary geothermal power plants.
Read full abstract