Abstract The Fukushima accident prompted rapid development in the appreciation and codification of BDB methodology into regulatory guidance and this is still continuing, especially at IAEA, which has recently and is due to publish several new standards documents directly relevant to BDB analysis. The objective of this paper is to provide a state-of-art review on how BDB evaluations are undertaken in the UK nuclear industry. Then, using the work undertaken for the Generic Design Assessment (GDA) in the UK for UK HPR1000, this paper proposed a more systematic approach for “cliff-edge” evaluation based on a generic nuclear power plant design currently being developed in the UK.
Read full abstract