Ground vibrations induced by blasting are one of the fundamental problems in the mining industry and may cause severe damage to structures and plants nearby. Therefore, a vibration control study plays an important role in the minimization of environmental effects of blasting in mines. This paper presents the results of ground vibration measurement induced by bench blasting at Magnesite Incorporated Company (MAS) open pit mine in Turkey. The scope of this study is to predict peak particle velocity and to determine the slope of the attenuation curve for this site. For this purpose, the blasting parameters of 43 shots were carefully recorded and the ground vibration components were measured for each event. After carrying out statistical analysis, the site specific parameters were determined to predict the peak particle velocity. In the light of this analysis, the prediction graphics of maximum charge weight per delay versus distance for different damage criteria was proposed to be able to perform controlled blasting in order not to damage to the nearby structures, especially to the plant where rotary and shaft kilns have been established.
Read full abstract