This paper presents an application of a previously developed linear programming-dynamic programming (LP-DP) methodology to the operation of Andong and Imha parallel reservoirs in South Korea. The model allows for multioptimization of power generation and municipal, industrial, and irrigation water use. It is shown that the annual average energy and the annual average water supply generated from the joint operation of the two parallel reservoirs by the LD-DP approach is 15.2 and 1.7% more than the contracted power production and water supply respectively.