Geological conditions of salt cavern gas storage in China are characterized by dominantly layered salt layers with a high content of insoluble mudstone. After the water leaching of the salt layer, a large amount of sediment accumulates at the bottom of the gas storage cavity. During the gas injection process, only the clean brine above the sediment can be expelled, leaving a brine layer of 2–5 m and a large amount of brine in the pore space of the sediment. To increase storage capacity, it is urgent to explore the secondary gas injection and brine drainage technology to further expel residual brine in pores of the sediment at the cavern bottom. The sediment is relatively loosely packed and is composed of mudstone particles, which easily migrate and block the brine withdrawal pipe. In this paper, firstly, the mineral composition, particle size and distribution characteristics of the sediment at the bottom of the salt cavern are fully understood by XRD and sieve analysis methods. Then, a lab simulation device suitable for secondary gas injection and brine drainage of a high-salinity salt cavern with a diameter and height of 25 cm was designed and built. A screen sand control experiment, a gravel pack artificial wall sand control experiment and chemical cementing sand were simulated. The effects of gas injection, brine drainage pressure, brine layer height and insoluble particle size on sand production and liquid drainage were studied. The influence factors of brine withdrawal on the sand control in secondary brine drainage were intensively investigated, and finally, the gravel pack artificial wall sand control technology system was recommended. The optimal construction parameters for secondary brine discharge are recommended as follows: Under the condition of gravel packing with the same particle size, the trend of sand content with different artificial wall thicknesses is not obvious, and a 2 cm wall thickness is the best in the overall experiment, corresponding to 28 cm in the field. The larger the particle size of the gravel pack, the better the sand control, and the best gravel size is 10–20 mesh. The injection pressure should be as low as possible.
Read full abstract