At present, shale gas pressure fracturing volume development technology tends to be mature, shale gas backlog fracturing ends and enters the trial production stage. Due to the improper control of oil nozzle or its causes, the output drops sharply, or the drainage in the production process makes the funnel effect near the wellbore zone, resulting in the closure of the main fracture passage near the wellbore. However, the far-end complex sealing network structure produced by volume fracturing technology is still not fully closed, or secondary fractures occur in the absence of support for the original wellbore fractures or new complex fractures occur in the vicinity of the wellbore. The simple use of high-energy gas fracturing requires low cost, safety and simple and efficient characteristics, and the requirements for surface equipment are not too high. Existing methods mainly include well testing, sand washing by coiled tubing, gas lifting by coiled tubing, wellbore plugging removal, pumping and drainage by supplementary pressure well operator, etc. They can not fundamentally solve the need of closing or reopening new fractures in wellbore, and can not make new complex unclosed fractures near wellbore zone (without secondary fracturing). If the investment of surface equipment for secondary fracturing is similar to that of the first volume fracturing, and the investment is similar, the more complex situation will arise because of filtration and other reasons. At present, low concentration methane in air and wellbore is used to oxidize and exothermic to produce CO2 and H2O, and release energy at the same time. Temperature and pressure are the main means of energy in limited space. High energy gas formed after volume work can help to reopen the original fracture and form a new type of high energy gas fracturing method by means of air ignition and explosion, because the effect of high energy gas fracturing is not affected by stress, new cracks can be produced, and this crack can avoid overlapping with previous cracks. In particular, it can be pointed out that due to the improvement of thermal recovery of heavy oil and other means, the ground operation equipment has the commonality, and reasonable optimization of the construction plan can achieve the established purpose.
Read full abstract