Kodingare Island is located in Pulau Sembilan District, Sinjai Regency, one of nine islands. Currently, most people still rely on conventional energy from diesel power plants. The reason is that this island does not yet receive an electricity supply from the electricity grid due to the geographical limitations of the archipelago. It is known that the most potential renewable energy source on Kodingare Island is solar energy, with a potential for solar radiation reaching 5.86 kWh/m2/day. This research aims to analyze an innovation that combines PV and solar, where PV acts as the main electricity generator, while solar functions as a backup and additional energy source. The method used in this research uses simulation methods, layout modeling, and financial analysis using HOMER Pro simulation software to determine the potential and performance of hybrid power plants and SketchUp Pro software to produce three-dimensional layouts and economic and feasibility values obtained through financial analysis. Technical aspects include producing an electrical energy system of 37,029 Wh/year, consisting of PV of 32,981 Wh/year and solar of 4,048 Wh/year with energy consumption of 33,850 Wh/year. The required fuel consumption is 2,086 L/year, with excess electricity of 931 kWh/year and renewable energy penetration of 89.1%. From an economic perspective, planning this hybrid power system requires an investment of 258.290.000 IDR, O&M costs of 19.350.600 IDR, and the cost of energy value of 1,352/kWh IDR. In contrast, from the feasibility aspect of planning a hybrid electric power system, it is said to be feasible because it produces a Net Present Value of 9,870,151 IDR, is more significant than zero, the Profitability Index is 1.03 greater than one, the Internal Rate of Return is 8.90% greater than the credit interest rate of 8.43% and the Payback Period required for return of capital is nine years nine months.
Read full abstract