The purpose of this paper is to supply technical data for the proposed field energization of 500kV transmission lines present in the Brazilian interconnected system, forming a line, henceforth called AC-Link, slightly over a half-wavelength in 60Hz. The purpose of the test is to investigate overvoltages and currents that result from the energization of the AC-Link. This paper shows the results of simulations performed in ATP (Alternative Transients Program) when considering the occurrence of three-phase faults along the AC-Link during energization. The results obtained show that, in certain situations, the overvoltages and energies in the arresters may reach very high values and some specific mitigation procedure should be implemented.