A series of settlement, cracking, and collapse of the Zhengjiaping slope has been increasingly developing since October 2015 during impoundment at the Dagangshan Hydropower Station. It is a dangerous signal, which means thatlandslide potential will be existed for the Zhengjiaping slope and poses greatthreat to the operation of hydropower station and traffic safety. Related slope protection measures and research studies have been implemented accordingly in the Zhengjiaping slope to prevent and control adverse influences on property security and human life in the reservoir area. In order to understand the geological and hydrological settings of the Zhengjiaping slope and its surroundings, a field investigation was carried out to determine the lithological composition and toppling/sliding deformation characteristics using exploratory adit and site boreholes. The large deformation process in the apparently deformed area was analyzed using borehole inclinometers and global navigation satellite systems (GNSS). It was found that the apparently deformed area zone was characterized by crushed rock masses, with only a small amount of slope deposits and the sliding deformation occurring in Zone I. The deformation process of the reservoir landslide was considered to be a complex integration of the geological effects of various adverse factors. Impoundment and heavy rainfall are the direct causes of sliding deformation. During the preparation of the basic conditions for sliding, lithology, tectonic activity, and artificial disturbances play an important role, including the sliding mass and the sliding surface zone.
Read full abstract