The bridge at the junction of M7-M70 motorway crosses the main road at an angle of approximately a = 40 degrees. The bridge has a point-symmetrical arrangement in the horizontal plan. The structural height on the line of the road was given (h = 1.60 m), the spans of the edge beams were determined by the geometry of the general layout: L (l) = 52.26 and L(2) = 61.98 m. The ratio of the larger span and the structural height is L/h = 38.75. With the above ratios, the extradosed system was the appropriate solution.(A)