Automatic real-time warning networks are essential for the almost immediate detection of anomalous levels of radioactivity in the environment. In the case of Extremadura region (SW Spain), a radiological network (RARE) has been operational in the vicinity of the Almaraz nuclear power plant and in other areas farther away since 1992. There are ten air monitoring stations equipped with Geiger–Müller counters in order to evaluate the external ambient gamma dose rate. Four of these stations have a commercial system that provides estimates of the total artificial alpha and beta activity concentrations in aerosols, and of the 131I activity (gaseous fraction). Despite experience having demonstrated the benefits and robustness of these commercial systems, important improvements have been made to one of these air monitoring systems. In this paper, the analytical and maintenance shortcomings of the original commercial air monitoring system are described first; the new custom-designed advanced air monitoring system is then presented. This system is based mainly on the incorporation of gamma spectrometry using two scintillation detectors, one of NaI:Tl and the other of LaBr3:Ce, and compact multichannel analysers. Next, a comparison made of the results provided by the two systems operating simultaneously at the same location for three months shows the advantages of the new advanced air monitoring system. As a result, the gamma spectrometry analysis allows passing from global alpha and beta activity determinations due to artificial radionuclides in aerosols, and the inaccurate measurement of the gaseous 131I activity concentration, to the possibility of identifying a large number of radionuclides and quantifying each of their activity concentrations. Moreover, the new station’s dual capacity is designed to work in early warning monitoring mode and surveillance monitoring mode. This is based on custom developed software that includes an intelligent system to issue the necessary warnings when radiological anomalies or technical problems are identified. Implicitly, for the construction of the advanced station, substantial mechanical and electronic developments have been required. They have essentially consisted of integrating a new replacement device, whose operation has reduced the maintenance tasks.