The paper presents the results of a study of permissible dynamic load on high-pressure gas pipe laying site of the II category located within the mining lease boundaries, in connection with carrying out blasting operations at the open-pit mine of JSC Sukholozhsktsement. The procedure of IM UrB RAS for calculating the permissible distances from the technological explosion in the mine to the protected object (gas pipeline) depending on the explosive weight in the stage, coefficient of soil conditions and permissible velocity of seismic vibrations is presented. It is found that depending on the explosion depth in the mine and using corresponding geological data, by changing the weight in the delay stage, it is possible to completely eliminate the negative effect of explosion on pipe laying area. A calculation scheme is also proposed to determine the safe distances to high-pressure gas pipeline depending on the angle of open pit side and blasting depth.