The on-site verification of electric energy meters has become an indispensable part of power system equipment maintenance. Recently, under the call of the State Grid Corporation of China to further optimize the business environment, in order to reduce the time of power outages for customers, the “non-interruption meter replacement” business is also actively promoted. A special wiring board is installed in the single-phase energy measurement box to ensure replacement. The meter does not lose power, but this measure has greatly affected the on-site verification of the energy meter. This article is based on the new environment of “uninterrupted power meter replacement”, in-depth demonstration of the necessity, feasibility, and ease of development of a dedicated plug-in meter for the on-site verification of electric energy meters. Based on the premise of modularization, a special plug-in strip for the on-site verification of electric energy meters has been developed to ensure that the on-site verification of the electric energy meters is not affected.