China's construction industry has been suffering from high cost, high efficiency, and maladjustment of management. The traditional management mode makes the construction project face the risk of cost overruns and delays, which cannot achieve the effect of cost control. Therefore, by summarizing the characteristics of construction projects and the classification of costs, this paper analyzes the foundation of earned value management method in construction and combines it with cost management; in addition, the actual development of Company A is taken as an example, where a cost early-warning system suitable for construction projects is constructed, including the design of the organizational structure, operation platform, and early-warning model of this system, which can improve the cost management level of construction enterprises to a certain extent.