In order to recover the strip pillar coal resources, reduce the amount of gangue mountain and realize remediation of the goaf environment in the old mining area, the raw gangue filling mining technology was proposed. According to the previous practical experience, the feasibility of the implementation of raw gangue filling mining technology in the coal-pressed area was analyzed. Through the filling gangue compaction test, the deformation under different loading stages was obtained. Further, a reasonable prediction of the deformation beyond the experimental limited loading load was made based on the experimental results. Through the deformation source analysis of the whole process of gangue filling, the key factors for controlling deformation before, during, and after filling were determined. Additionally, the proportion of deformation during different stages was quantified. Considering the protection of surface buildings, mining fullness of the working face and mining technology, the production parameters of 1209 and 1210 filling working faces were preliminarily determined. Through numerical simulation, the rationality of mining scheme was verified. Based on the practice of 1209 working face and the key factors to control the deformation of gangue filling, the mining system and process in 1210 working face were optimized. According to the measured surface rock movement, raw gangue filling mining technology can meet the requirements of surface building protection level. Especially, this paper provides a method to quantitatively calculate the equivalent mining height (EMH) of raw gangue filling and its mining deformation, which has reference significance for old mining areas.
Read full abstract