The Dawan-Pesinggahan Road section is one of the sections that has the status of a district road in Klungkung Regency. The Dawan Pesinggahan Road section is located in Dawan District, Dawan Village and Pesinggahan Village, which has a length of 3,300 km and an average width of 4.5 m. The Dawan – Pesinggahan Road section has existing conditions in 2021, namely 3,300 km in good condition, 0.9 km in moderate condition and there are conditions of light and heavy damage. In 2022, there will be a lot of road damage which will cause the condition of the road to decline and it is very necessary to assess the condition of the road so that we can find out what measures will be taken to restore road stability on the Dawan-Pesinggahan Road Section. Assessment of road conditions using the SDI method in Klungkung Regency was carried out on the Jl. Dawan – Stopover. The selection of this section as a sample was due to time constraints and the district road section used as a travel center in Klungkung Regency which needs to receive more attention through road management. Apart from that, the section used is a road section that visually has road damage. This research was carried out because there are still damaged roads that need to be treated quickly. This research aims to analyze road conditions, analyze the type of treatment and obtain costs for handling the road section. The data used in the research are primary data and secondary data. Primary data was obtained through a survey of road conditions by measuring road damage, while secondary data was obtained from the community development sector of the Klungkung Regency PUPRPKP Service, namely Klungkung Regency road decrees, Klungkung Regency road maps and basic Klungkung Regency road data. The research stages are, identifying road damage by taking measurements, data recapitulation by processing surveys, data analysis using the SDI method and estimating costs to repair the road. Assessment results for the Jl. Dawan – Pesinggahan Crocodile cracks at 13.54%, random cracks 18.71%, transverse cracks 17.06%, patches 14.66%, holes 12.03% and subsidence 13.24% and the estimated cost required to maintain this road section is IDR. 3,864,775,688.95
Read full abstract