The current paper introduces for the very first time recently invented electrodeposition-redox replacement (EDRR) method in continuous leaching-recovery-solution purification process. The mini-pilot study reveals that longer duration of the EDRR process is beneficial as it increases gold recovery per stage and decreases the specific energy consumption of the EDRR. This extraordinary behavior is postulated to be inherent to the EDRR process, as during the EDRR the cathode surface is gradually transformed from stainless steel surface to gold(±copper) surface, thus increasing process performance with time. In addition, gold concentration of 1 mg/L in the PLS was established as the minimum concentration required for efficient operation of the EDRR process.Gold extraction from ore to solution throughout the pilot test reached up to ca. 90%, whereas in reference cyanidation test only 64% of gold was dissolved. Overall, after 150 h of pilot experiment, 83% of dissolved gold was recovered from solution on the cathode, resulting in 68.5% holistic recovery of gold from ore. Furthermore, process simulation model was built, and it suggested that closed-loop operation of cupric chloride leaching – EDRR recovery – copper precipitation process can recover in total over 84% of gold from refractory telluride ore to the cathode product, providing further evidence of true potential of EDRR in sustainable gold extraction.
Read full abstract