After the construction of the BESIII drift chamber, a long period of cosmic rays test is necessary to verify its performance. This also provides a good opportunity to integrate the detector readout electronics and Detector Control System (DCS) into a unified working system. The goal of the DCS is to guarantee reliable physics data quality and the safe operation of the detector. It monitors and controls the HV, gas, VME crates and the environmental variables. The upper-level system is mainly developed from LabVIEW and the lower-level system mainly uses MCU and PLC technology. The system is designed to be highly flexible and scalable so that it can be applied to other detectors with little or no change. In the immediate future, it will be integrated into the entire BESIII Slow Control System.