A 6 m high reinforced embankment constructed on deep-mixing improved soft Bangkok clay is presented. The jet mixing method with cement slurry employing a jet pressure of 20 MPa was utilised in the installation of deep mixing piles. Surface settlements and lateral movements were monitored during and after construction. The deep mixing improvement has effectively reduced the settlement by as much as 70%. The differential settlement between pile and soil ranged from 8 to 20% of the average settlement. Moreover, the back analysis confirmed the laboratory investigation that the soil–cement pile installed by jet mixing can have a higher after-curing void ratio and, consequently, higher permeability and coefficient of consolidation. Finally, the higher permeability ratios, Kv,p/Kv,c, of 30 and 40 were confirmed from numerical and analytical back analyses, respectively. Une berge renforcée de 6 m de hauteur, construite sur une argile tendre de Bangkok améliorée par mixage profond fait l'objet de cette étude. Nous avons utilisé la méthode de mixage par injection de ciment liquide, sous une pression de 20 MPa, dans l'installation de piles à mixage profond. Les affaissements de surface et les mouvements latéraux ont été suivis pendant et après la construction. L'amélioration par mixage profond a effectivement réduit de 70% l'affaissement. L'affaissement différentiel entre pile et sol représente 8 à 20% de l'affaissement moyen. De plus, la rétro-analyse a confirmé l'étude en laboratoire montrant que la pile sol-ciment installée par mixage à injection peut avoir un taux de pore plus élevé après cuisson et, en conséquence, une perméabilité et un coefficient de consolidation plus élevés. Enfin, des taux plus élevés de perméabilité, Kv;p/Kv;c, de 30 et 40, ont été confirmés par les rétro analyses numériques et analytiques respectivement.
Read full abstract