Abstract This paper is the final report on a study made of the performance of 250 large steam boilers over a period of three years. The results of the first year’s study were reported at the 1929 Annual Meeting of the A.S.M.E., and a summary of the full three-year period was presented at the 1931 Annual Meeting. The study was requested by the Central Station Power Committee of the Power Division. The primary object was to study boiler outages and their causes and the effect of such factors as severity of use, design, fuels, and methods of firing on boiler reliability, in the hope that a yardstick might be obtained by which the individual operator could measure the performance of his own units and predict the probable availability of new designs. The data obtained from each unit are presented, together with some comparisons of types and classes of unit. There also is a discussion of primary causes of boiler shutdown, which has not appeared in either of the previous papers.