It is proposed to demonstrate oxyfuel technology at the 100MWe scale in KOSEP's 125MWe Young Dong Unit 1 Power Station. Prior to this it will be necessary to convert the existing boiler from anthracite firing to bituminous coal firing as the domestic anthracite source is nearing exhaustion. The oxyfuel demonstration project is being undertaken by a consortium of industrial companies, research agencies and universities, with the financial support of the Korean Government. Phase 2 of the project, the FEED, is nearing completion. Within this phase DPS have undertaken the design of the boiler plant. Key issues considered included the strategy to convert the boiler to bituminous coal, and a feasibility study investigated the various options. Having selected the preferred option the boiler thermal performance and burner operation under air and oxyfuel operation was determined. It was shown that it is technically viable to convert the boiler for oxyfuel operation.