The commissioning of the Big Circle Line in Moscow, some sections of which were laid jointly with Chinese underground builders, provided the first experience of interaction with foreign construction contractors on the Moscow Metro. The paper investigates this experience which is of value for the development of such works in the future. The analysis was carried out on the basis of scientific and technical documentation on certain facilities, the progress and results of construction and installation works, and information on other events. The paper describes the facilities where construction and installation works were carried out by joint efforts and shows the peculiarities of interaction between Russian and foreign (Chinese) metro builders on a number of sections of the Big Circle Line of the Moscow Metro. The achieved results are demonstrated by the example of individual underground stations. The study reveals the peculiarities of material and technical support of works on the sections constructed by Chinese construction contractors. The mutual exchange of experience, technologies, and work management practices along with the application of various tunnel boring machines from both countries (Russia and the PRC) has yielded fruitful results, demonstrated the possibility and efficiency of the direct engagement of foreign tunnel builders at Russian sites in close cooperation with their Russian counterparts, and revealed a scheme for rational division of labour, work management, and logistical support of works.