Abstract

Due to the insufficient consideration of medium and long-term wind power contract power in short-term dispatch, long-term planning and real-time consumption of wind power cannot be effectively undertaken, resulting in a large amount of abandoned wind power. A way to improve the wind power absorption capacity has become an urgent problem to be studied. According to the characteristics of the market and dispatching in the process of wind-fire integration construction, this paper constructs a wind power consumption model that connects the mid- and long-term transaction power decomposition and short-term dispatch. Considering the unit output characteristics and maintenance, the monthly contract electricity is decomposed into daily electricity, and the nesting of medium and long-term transactions and short-term scheduling is realized; the second stage is a short-term multi-objective optimal scheduling model considering the decomposition of contract electricity and the output of non-bidding units to improve the real-time consumption of wind power. Finally, a province in northwest China is taken as an example to verify the effectiveness of the proposed method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call