Abstract

The Wide-Field Infrared Survey Telescope (WFIRST) mission is the next large astrophysics observatory for NASA after the James Webb Space Telescope and is the top priority mission from the 2010 National Academy of Sciences' decadal survey. The WFIRST Optical Telescope Assembly (OTA) includes inherited composite support structures that were originally designed and tested for room temperature operation; however, the WFIRST mission will require operation at colder temperatures to achieve sufficient sensitivity for the infrared wavelengths. We will present the results and conclusions of testing completed at the coupon and engineering model level to verify that the inherited composite structures will maintain mechanical integrity and performance over the required temperature range. The testing included: (1) characterization testing of constituent material coupons, (2) thermal cycling and static load testing of a representative aft metering structure (AMS) and forward metering structure (FMS), and (3) thermal cycling and dynamic testing of a representative secondary mirror assembly (SMA).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.