Abstract

AbstractWeather is a crucial factor and the most unpredictable of all the factors determining success or failure of any offshore activity, such as investments in seabottom grid connectors (gas, energy or communication), oil & gas drilling facilities development as well as erection of offshore wind farms. Weather conditions cannot be foreseen accurately over a time horizon longer than a few days, and so arranging a realistic work schedule for such an enterprise poses a great challenge. This paper identifies and analyzes the greatest risks associated with weather conditions at sea. The importance and impact of weather on the project implementation were assessed and mitigating measures were proposed. As part of the work, a review of scientific literature was conducted, while the core conclusions were reached using the information-gathering techniques and a documentation review of the offshore projects implemented in cooperation with the Maritime Institute. The authors based their analysis on experience from survey campaigns conducted in the Baltic Sea in the areas of the investments planned for implementation. The analysis of risks associated with weather conditions is based on the statistical weather data obtained using the WAM4 model.The research reveals that it is impossible to create an accurate survey schedule for long-term offshore projects, however, using statistics for each individual hydrodynamic parameter can, to some extent, facilitate the creation of survey schedules for maritime projects.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call