Abstract

Waste material can be interpreted as undesirable or valueless material for ordinary or primary purposes in the manufacture or use. This study aims to determine how much the remaining material that occurs in concrete construction work and the form of handling carried out to prevent material waste. The purpose of this study was to determine how much material waste occurred, losses caused by material waste and to find out the cause of material waste. The research sample taken was a low rise building project in Jakarta and its surroundings. The method used in data collection is field observations and interviews. Data obtained in the form of Bill of Quantity, working drawings, or monthly reports. Data analysis using quantitative analysis to determine the largest type of material and losses in concrete work calculated by the regression method assisted by the SPSS program to get the large losses that occur in concrete construction work. The results obtained are the largest residual construction material in concrete construction is 7.05% for low rise building projects in Jakarta and surrounding areas and losses (%) that have a regression such as the following Y = -1.640 + 0.669 X1 + 0.481 X2 + 0.098 X3.AbstrakWaste material can be interpreted as undesirable or valueless material for ordinary or primary purposes in the manufacture or use. This study aims to determine how much the remaining material that occurs in concrete construction work and the form of handling carried out to prevent material waste. The purpose of this study was to determine how much material waste occurred, losses caused by material waste and to find out the cause of material waste. The research sample taken was a low rise building project in Jakarta and its surroundings. The method used in data collection is field observations and interviews. Data obtained in the form of Bill of Quantity, working drawings, or monthly reports. Data analysis using quantitative analysis to determine the largest type of material and losses in concrete work calculated by the regression method assisted by the SPSS program to get the large losses that occur in concrete construction work. The results obtained are the largest residual construction material in concrete construction is 7.05% for low rise building projects in Jakarta and surrounding areas and losses (%) that have a regression such as the following Y = -1.640 + 0.669 X1 + 0.481 X2 + 0.098 X3.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.