Abstract

In the implementation of a project, it cannot be separated from the name of obstacles or failures. Failure can be caused by waste, including material delays, work repetition, low labour productivity, implementation strategies and poor project planning. Lean Construction handles projects by minimizing waste and trying to produce the maximum value possible. This research aims to identify waste factors in building construction and then analyse the dominant factors of waste. The data was collected using a questionnaire from 23 respondents involved in projects execution and then analysed using the Simple Additive Weighting (SAW) method to find the dominant waste factor in building construction projects in Malang City. According to the calculation, the result shows that the most dominant factor of waste from construction projects in Malang City is waiting criteria with a value of 0,278. Furthermore, the identified results will be used to determine the appropriate strategy towards zero waste.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.