Abstract

This study proposed an analytical model for the tunnel supported with a tangentially yielding liner in viscoelastic ground. The efficiency of the developed analytical model was verified by comparing the calculated results with associated numerical simulation results. Using the analytical model, a comprehensive parameter sensitivity analysis was performed to examine the effects of the rate of tunnel face advancement, concrete liner thickness, installation time of liner, and strength and thickness of yielding elements on the tunnel responses. The results highlight the significant benefit of the tangentially yielding liner to relieve overstress in the tunnel liner and improve the stability of the tunnel. The yield efficiency of the tangentially yielding liner depends highly on the yielding strength and deformable capacity of the yielding elements and less on the installation time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.