Abstract

Libyan national plan (LNP) to resolve the water shortage problem will be illustrated through a quartet of a series of papers. The first series of papers (I) will deal with Great Man-Made River (GMMR) supplied from rich ground water reservoirs located in the southern desert regions. This paper (Ib) will conduct the cost analysis study by considering the influence of interest rates on capital costs, as compared to the first paper (Ia) which neglected the effect of interest rates and treated capital costs as sunk value. This will improve the ability to analyze the viability and feasibility of this mean in comparison with other means to resolve the water shortage problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.