Abstract
Traffic delay is an important measure to evaluate road operation efficiency and service level, which can reflect the rationality of road design and intersection signal control scheme design. Therefore, delay analysis is of great significance to the evaluation of road service level and intersection signal control scheme design. In this paper, the point sample method and VISSIM simulation software are used to study the traffic delay of Yingbin Road and Century Road intersection in Jiaozuo City, and the traffic condition of the intersection is evaluated according to the calculation results. In this paper, the point sample method and VISSIM simulation software are used to study the traffic delay of Yingbin Road and Century Road intersection in Jiaozuo City, and the traffic condition of the intersection is evaluated according to the calculation results.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have