Abstract

At the modern stage of construction branch development there is a current task of forming the indicator, the application of which will allow forecasting the final indicator of a construction project depending on organizational-technological and management solutions influencing it - the organizational and technological capacity of a construction project. The construction project capacity, which has been actively investigated in the recent years, is formed on the basis of account for the processes directly or tangentially related to production and technological specifics of the construction industry on all the stages of project development: design solutions, preparation of a construction site, general construction and finishing works, special works (building water supply and water disposal systems, technological equipment, electric wiring and low currents, ventilation, conditioning and fire security, elevators), external supply lines, amenities. The introduction of organizational-technological capacity concept of a building project in the form of a numerical integral value is given in the article, allowing to make relevant management decisions at any step of the construction project. The article deals with the essence of information flows as an important component in the construction project evaluation. The authors discuss the separation of information flows into groups, depending on different criteria. As a result, the mathematical model is offered, which gives the construction project potential evaluation with taking into account the impact of information flows.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call