Abstract
The divertor area of ITER vacuum vessel consists of 54 modular cassettes which must be exchanged after every 3–4 years of plasma operations. Divertor Cassettes are locked in the vacuum vessel by means of compressing them against the rails mounted in the inner and outer walls of the vacuum vessel. According to ITER reference cassette locking system, a Divertor Cassette has to be preloaded with a compression force of 360 kN against the vacuum vessel rails. The preloading of the cassettes is carried out with a hydraulic jack tool which is fitted into the cassette body. The Jack will transmit a hydraulic force by pushing the cassette latches against the outer rails, transmitting therefore the required preloading compression force to the cassette. This paper deals with the validation of Divertor Cassette locking system and it also describes the design and testing of a radiation-hard, water hydraulic jack. The validation of Divertor Cassette locking system has been the first Divertor Maintenance operation tested at Divertor Test Platform 2.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.