Abstract
The problem considered is short term scheduling in multipurpose batch plants when the main objective is adherence to due dates. The solution approach contemplates a two-phase procedure. The planning phase consists of processing time-windows for all the necessary batches to meet the products' demand. This information is extensively uses in the scheduling phase. Three approaches are considered in the last phase, a MILP formulation using uniform discrete time representation; constrained based search (CBS) and simulated annealing (SA). And assessment is made of these techniques in heavily constrained problems and how these approaches deal with equipment units sharing and constraints imposed by material balances and storage conditions. The advantages of the two-phase approach are shown in each case with illustrative examples.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.