Abstract

This document contains the Utility Assessment Report (UAR) for the Phase 2 operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) Joint Capability Technology Demonstration (JCTD). The UAR for Phase 2 shows that the SPIDERS system was able to meet the requirements of the Implementation Directive at Ft. Carson.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call