Abstract

In spring 2020, Commonwealth Edison (ComEd) in Chicago, IL broke ground on Chicago's first permanent Resilient Electric Grid System utilizing high temperature superconductor (HTS) cable after successfully achieving the US Federal Energy Regulatory Commission (FERC) approval for the classification of this being a transmission asset. This permanent grid project, commissioned in August 2021, represents the first commercial adoption of the technology in North America, a major benchmark for the acceptance of HTS electric power applications.