Abstract
Time and cost are two critical factors determining the success of a construction project. However, it is still a daunting task for project planners to develop a time–cost integrated schedule due to the tremendous amount of information that need to be processed. Various research efforts have been made to develop model-based systems to facilitate information processing and integrate time and cost throughout the project life cycle. However, the results of the previous studies are not comprehensive enough to fulfill the requirements of project management. This paper presents a scheduling system that applies Multi-Dimensional (MD) CAD model, Object Sequencing Matrix (OSM), and genetic algorithms (GAs) to generate the time–cost integrated schedule for the construction project. A computer implementation called MD CAD model-based Project Scheduling System (MD_PSS) is also developed to verify the feasibility of the proposed approach.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.