Abstract

Abstract Construction projects are becoming progressively larger and more complex in terms of physical size and cost. Building information modeling (BIM) is being regarded as a revolutionary change for managing the entire lifecycle of a construction project. However, the information provided by BIM cannot fulfill the requirements of on-site project scheduling and management. This paper presents a BIM-based framework with the function of developing the near-optimum schedule plan according to project objectives and project constraints for project scheduling and management. An automated database management system, a schedule simulation system, and a MD (multi-dimensional) CAD model creator provide a reliable platform for the proposed framework. To verify the concept and test the feasibility of this framework, a computer implementation called NDSM (N-Dimensional project Scheduling and Management system) was developed and implemented in a construction project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.