Abstract

This paper studies the power generation plan when the power is cut off within a week in the factory. Considering various factors that affect the cost, it comprehensively analyzes the possibility of opening the plan and the influence of three kinds of costs on the total cost, and establishes a multi-constraint integer nonlinear optimization model. In order to minimize the total cost of a week, a minimum model of fixed cost, marginal cost and start-up cost was established, and a seven-day minimum cost scheme was obtained by means of dynamic programming.After changing the output power of the generator, the constraint conditions of the output power are adjusted based on the model of the above problems, and a new model of electricity demand and generation is obtained.In this paper, the model is extended to other problems of continuous segmentation, and the improvement can be generalized to solve such problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.