Abstract

Results from using the mathematical model simulating the power unit of the Kudankulam nuclear power station, which is being constructed in India according to the Russian project, for comprehensively testing the algorithms of monitoring and control systems are presented. The use of the Tekhnolog computerized system makes it possible to optimize control and monitoring systems at the very early stages of project development.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.