Abstract

This paper introduces a new integrated model for the combined days-off and shift scheduling problem (the tour scheduling problem). This model generalizes the forward and backward constraints, previously introduced by Bechtold and Jacobs for the shift scheduling problem, to the tour scheduling problem. This results in a general and compact formulation that can handle several types of scheduling flexibility. We also provide a new proof of the correctness of forward and backward constraints based on Benders decomposition. The latter approach is interesting in itself because it can be used to solve the problem when extraordinary overlap of break windows or start-time bands is present. A discussion of model size for a set of hypothetical test problems is presented to show the merits of the new formulation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.