Abstract

The use of Reclaimed Asphalt Pavement (RAP) in lieu of virgin crushed stone aggregate is becoming a widely accepted practice for a number of construction applications, particularly pavement base courses. A number of laboratory RAP studies have considered the mechanical properties of RAP bases in order to support pavement designs incorporating RAP. These studies have revealed a number of interesting relationships between RAP moisture content, compaction, and stiffness. This paper discusses the experiences of a design-build contractor integrating a geosynthetic ground improvement program with a RAP base during the reconstruction of a 1.95 ha asphalt parking lot. Field observations of base course construction with RAP explore some of the implications of laboratory findings. A number of interesting observations on the technical, construction, and economic issues resulting from the project challenges and the use of RAP are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.