Abstract
The monitoring of buildings and structures condition, as well as the timely implementation of corrective actions aimed at the elimination of adverse factors, are the most important aspects that shall be addressed at the construction stage. The usage of monitoring systems makes it possible to monitor the building condition and above that to implement more efficient design solutions in the prospective projects using the results of the analysis of the acquired and design data. In this work the review of a monitoring system installed in a high-rise building located in Ekaterinburg is given. The paper describes the analysis of the natural oscillation frequency and the logarithmic decrement of fundamental tone acquired with the help of accelerometers, and compares the values with the acceptance limits. The process of converting data acquired by strain gauges for the determination of the stress-strain condition of the bearing structures is analysed. The process of comparison of data obtained by the monitoring system of a high-rise building is described. The necessity of the application of the monitoring system is analysed.
Highlights
The large-scale construction of high-rise buildings in Russia started in the last decades
The usage of monitoring systems makes it possible to monitor the building condition and above that to implement more efficient design solutions in the prospective projects using the results of the analysis of the acquired and design data
In this work the review of a monitoring system installed in a highrise building located in Ekaterinburg is given
Summary
The large-scale construction of high-rise buildings in Russia started in the last decades. The reliability and safety of such buildings are the issues of the topmost priority for the design development, construction, and further condition monitoring. The first examination of the technical condition of high-rise buildings and structures is carried out within two years after the commissioning. 2. Application of a monitoring system as exemplified by a high-rise building in Ekaterinburg The "Champion park" is one of the Ekaterinburg high-rise residential complexes. Application of a monitoring system as exemplified by a high-rise building in Ekaterinburg The "Champion park" is one of the Ekaterinburg high-rise residential complexes At this moment the second phase of the project is being completed, and the third phase is commenced.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.