Abstract
Broken Aro mine is an abandoned underground mine complex last mined in 1910. Acid mine drainage (AMD) from the mine has negatively impacted the water quality in Simmons Run. Re-mining of Broken Aro allowed for recovery of an energy reserve, exposure of the AMD source, de-watering of the mine complex, and simple placement of a continuous mine seal. The fixated FGD scrubber by-product was chosen as the material for mine seal construction due to its low hydraulic conductivity and high alkalinity. The final seal was approximately 2600 ft long, 15 ft wide and was installed in two 4–6 ft compacted lifts for a total height of 8–12 ft. The seal was constructed concurrent with mining activities to maintain a continuous hydraulic barrier. The seal has retained water inside the mine complex and has decreased the contaminant loads to Simmons Run.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.