Abstract
Experience with the design and construction of a 70-meter metallic tower at a site with soils classed as type II in terms of proneness to slump-type settlement and foundations formed from BSS cast-in-place piles (in dry stable soils without stabilization of the walls of the holes) with holes widened at their bases is brought to light.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.