Abstract

It is proposed that calculations of itemized and summary preliminary planned production costs of articles and the subsequent use of the results in the course of technical training and production should be performed with the use of the software of the Stalker PLM v. 7 integrated computer-based information system and the electronic structure of the article. Implementation of the functions of the integrated computer-based information system related to business processes involved in design and planning of production for the purpose of performing preliminary calculations of articles at itemized and summary levels is demonstrated. Quantitative and qualitative indicators from the introduction of Stalker PLM v. 7 at chemical and oil-and-gas machine production enterprises are obtained from the results of practical approval.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.