Abstract
The authors present short- and long-term supply schedules for the primary US copper industry. These schedules are based on the economic theory of supply, and are derived from site- and input-specific cost data. Cost figures are arrived at by a combination of engineering process analysis and statistical cost estimation. The supply functions can be used to evaluate the effects of changes in market, policy, or other variables on US copper supply.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have