Abstract

The uplift capacity of rock anchor groups was examined by full- scale field tests in different rock formations. The results are analyzed and the different modes of failure are discussed in view of the test results with emphasis on the rock pull-up failure mechanism. Important design parameters are summarized for the convenient use of the engineer in the design of transmission tower foundations anchored in bedrock.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.