Abstract
This paper addresses the problem of scheduling a set of independent jobs on unrelated parallel machines with job sequence dependent setup times so as to minimize a weighted mean completion time. The study of the problem stemmed from a real service industry problem. This problem is at least NP-hard in the ordinary sense, even when there are only two identical machines with no setups. Seven heuristic algorithms are proposed and tested by simulation. The results and analysis of quite extensive computational experiments are reported and discussed. The findings through the computational results are presented. Whether this problem is strongly NP-hard is left as an open question.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.