Abstract

To date, the topic of unrelated parallel machine scheduling problems with machine-dependent and job sequence-dependent setup times has received relatively little research attention. In this study, a hybrid artificial bee colony (HABC) algorithm is presented to solve this problem with the objective of minimizing the makespan. The performance of the proposed HABC algorithm was evaluated by comparing its solutions to state-of-the-art metaheuristic algorithms and a high performing artificial bee colony (ABC)-based algorithm. Extensive computational results indicate that the proposed HABC algorithm significantly outperforms these best-so-far algorithms. Since the problem addressed in this study is a core topic for numerous industrial applications, this article may help to reduce the gap between theoretical progress and industrial practice.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.