Abstract
During the design process of Unit type curtain wall, there are lots of problems which are worthy of exploring and need to be addressed. Through the International Plaza curtain wall engineering, the methodology of design is that forming a cross-section of steel and aluminum combination by inserting steel ferrule in to unit male frame and the female frame; meanwhile, by using a reasonable design to the shape and size, we can meet the requirement of the overall strength and stiffness of the unit mullion. Mechanical model, actual design of the project parameters and drawing conditions, which detail the design process and calculation results, are reasonable enough for curtain walls researchers and designers.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have